interEnergo Logo - Link zur Startseite

WPP Ivan Sedlo

WPP Ivan Sedlo

Wind Park Ivan Sedlo is Interenergo’s first investment in wind technology in Bosnia and Herzegovina. With its position on a mountain with an altitude over 1.500 m, it is also one of the highest wind parks in Bosnia. Upon its completion, this investment will represent one of the largest operating wind parks in the country.

General Information

  • Technology/activity area: wind power plant
  • Country: Bosnia & Herzegovina
  • Micro location: Municipality of Hadžići
  • Total rated capacity: 25 MW
  • Status: in development
  • Start-up: beginning of 2025

Key Figures

  • No. of turbines: 5
  • Turbine manufacturer: Siemens Gamesa 5.0 - 145 IIB
  • Turbine capacity: 5 MW
  • Rotor diameter: 145
  • Hub height: 102.5
  • Average annual electricity production/average output: 65,600 MWh
  • Annual CO2 savings: 32,144 t
  • Households powered with green energy annually: 10,933